Evaluación de la eficiencia productiva de los parques eólicos gallegos

  1. Iglesias-Gómez, Guillermo 1
  2. Seijas-Díaz, Amparo 1
  1. 1 Departamento de Economía Aplicada Universidade da Coruña
Revista:
Estudios de economía aplicada

ISSN: 1133-3197 1697-5731

Ano de publicación: 2008

Título do exemplar: Economía de los intangibles: Experiencias

Volume: 26

Número: 3

Páxinas: 167-194

Tipo: Artigo

DOI: 10.25115/EEA.V26I3.5676 DIALNET GOOGLE SCHOLAR lock_openDialnet editor

Outras publicacións en: Estudios de economía aplicada

Resumo

The aim of this research is to evaluate the efficiency levels of Galician wind parks in the generation of electricity in the year 2004. Methodologically, the main instruments used are Data Envelopment Analysis (DEA) techniques, as complements, parametric deterministic and stochastic techniques. The results show that there is a high average level of efficiency; in general some units however, do under perform in spite of the suitability of their operating conditions. This information should be useful for corporate promoters of wind parks, the regulator of the sector and society in general.

Referencias bibliográficas

  • AIGNER, D. J.; LOVELL C. A. K. y SMITH P. J. (1977): “Formulation and Estimation of Sthochastic Frontier Production Function Models”, Journal of Econometrics, nº 6, pp. 21-37.
  • ÁLVAREZ PINILLA, A. coord. (2001): La medición de la eficiencia y la productividad, Pirámide, Madrid.
  • BANKER, R. D. (1984): “Estimating Most Productive Scale Size Using Data Envelopment Analysis”, European Journal of Operational Research, nº 17, pp. 35-44.
  • BANKER, R. D.; CHARNES, A. y COOPER, W. W. (1984): “Some Models for Estimating Technical and Scale Inefficiencies in DEA”, Management Science, vol. 30, nº 9, pp. 1078-1092.
  • BARZEL, Y. (1964): “The Production Function and Technical Change in the Steam-Power Industry”, The Journal of Political Economy, vol. 72, nº 2, pp. 133-150.
  • CHARNES, A.; COOPER, W. W. y RHODES, E. (1978): “Measuring the Efficiency of Decision Making Units”, European Journal of Operational Research, vol. 2, nº 3, pp. 429-444.
  • CHITKARA, P. (1999): “A Data Envelopment Analysis Approach to Evaluation of Operational Inefficiencies in Power Generating Units: a Case Study of Indian Power Plants”, IEEE Transactions on Power Systems, vol. 14, nº 2, pp. 419-425.
  • CNE (2005): Información Estadística sobre las ventas de energía del Régimen Especial, Comisión Nacional de la Energía, Madrid.
  • COELLI, T. J.; RAO D. S. P.; O´DONNELL C. J. y BATTESE, G. (2005): An Introduction to Efficiency and Productivity Analysis, 2ª Edición, Springer, New York.
  • COOPER, W. W.; SEIFORD, L. M. y TONE, K. (2002): Data Envelopment Analysis. A Comprehensive Text with Models, Applications, References and DEA-Solver Software, 3ª Edición, Kluwer Academic Publishers, Boston.
  • FÄRE, R.; GROSSKOPF, S. y LOGAN J. (1983): “The Relative Efficiency of Illinois Electric Utilities”, Resources and Energy, nº 5, pp. 349-367.
  • FÄRE, R.; GROSSKOPF, S. y PASURKA, C. (1986): “Effects on Relative Efficiency in Electric Power Generation Due to Environmental Controls”, Resources and Energy, vol. 8, nº 2, pp. 167-184.
  • FÄRE, R.; GROSSKOPF, S.; YAISAWARNG, S.; LI, S. K. y WANG Z. (1990): “Productivity Growth in Illinois Electric Utilities”, Resources and Energy, vol. 12, ºn 4, pp. 383-398.
  • GOLANY, B.; ROLL, Y. y RYBAK, D. (1994): “Measuring Efficiency of Power Plants in Israel by Data Envelopment Analysis”, IEEE Transactions on Engineering Management, vol. 41, nº 3, pp. 291-301.
  • GREENE, W. (1993): “Frontier Production Functions”, en: H. O. Fried; C.A.K. Lovell y S.S. Schmidt (eds), The Measurement of Productive Efficiency. Techniques and Applications, Oxford University Press, New York.
  • JONDROW, J.; LOVELL C. A. K.; MATEROV, I. S. y SCHMIDT, P. (1982): “On the Estimation of Technical Inefficiency in the Stochastic Frontier Production Function Model”, Journal of Econometrics, nº 19, pp. 233-238.
  • LAM, P-L. y SHIU, A. (2004): “Efficiency and Productivity of China´s Thermal Power Generation”, Review of Industrial Organization, nº 24, pp. 73-93.
  • MEEUSEN, W. y VAN DEN BROECK, J. (1977): “Efficiency Estimation from Cobb-Douglas Production Functions with Composed Error”, International Economic Review, vol. 18, nº 2, pp. 435-444.
  • MEIBODI, A. E. (1998): Efficiency Considerations in the Electricity Supply Industry the Case of Iran, Surrey Energy Economics Discussion Paper Series, nº 95, University of Surrey, UK.
  • MURILLO, L. R. y VEGA, J. A. (2001): “The Use of Parametric and Non-Parametric Frontier Methods to Measure the Productive Efficiency in the Industrial Sector A comparative Study”, International Journal of Production Economics, vol. 69, pp. 265-275.
  • NAJAM, A. y CLEVELAND, C. J. (2003): “Energy and Sustainable Development at Global Environmental Summits An Evolving Agenda”, Environment, Development and Sustainability, nº 5, pp. 117-138.
  • NERLOVE, M. (1963): “Returns to Scale in Electricity Supply”, en Zellner R. (ed.), Readings in Economic Statistics and Econometrics, Little Brown, Boston.
  • OLATUBI, W. O. y DISMUKES, D. E. (2000): “A Data Envelopment Analysis of the Levels and Determinants of Coal-Fired Electric Power Generation Performance”, Utilities Policy, nº 9, pp. 47-59.
  • PARK, S. y LESOURD J. (2000): “The Efficiency of Conventional Fuel Power Plants in South Korea: a Comparison of Parametric and Non-parametric Approaches”, International Journal of Production Economics, vol. 63, pp. 59-67.
  • POLLITT, M. G. (1996): “Ownership and Efficiency in Nuclear Power Production”, Oxford Economic Papers, New Series, vol. 48, nº 2, pp. 342-360.
  • RICHMOND, J. (1974): “Estimating the Efficiency of Production”, International Economic Review, vol. 15, nº 2, pp. 515-521.
  • RODRÍGUEZ, J. L.; ARNALTE, S. y DÍAZ, J.C. (2003): Sistemas eólicos de producción de energía eléctrica, Editorial Rueda, Madrid.
  • SCHMIDT, P. y LOVELL, C. A. K. (1979): “Estimating Technical and Allocative Inefficiency relative to Stochastic Production and Cost Frontiers”, Journal of Econometrics, nº 9, pp. 343-366.
  • SEITZ, W. D. (1971): “Productive Efficiency in the Steam-Electric Generating Industry”, Journal of Political Economy, vol. 79, nº 4, pp. 878-886.
  • SUEYOSHI, T. y GOTO M. (2001): “Slack-Adjusted DEA for Time Series Analysis Performance Measurement of Japanese Electric Power Generation Industry in 1984-1993”, European Journal of Operational Research, vol. 133, pp. 232-259.
  • TONE, K. (2001): “A Slack-based Measure of Efficiency in Data Envelopment Analysis”, European Journal of Operational Research, nº 130, pp. 498-509.